
Since 2008
Environmental Engineering Equipment, Engineered for Real Sites
Jiangsu Xindi Environmental Engineering designs and manufactures wastewater-treatment and water-conservancy metal equipment for municipal, industrial and water-conservancy projects.
Explore EquipmentEquipment for every stage of treatment.
Explore screening, mixing, sludge handling and flow-control systems.

Start with your application.
Match equipment to water conditions, solids and the duty of your treatment line.
Can This Supplier Execute?
Manufacturing and Quality
Operating from over 15,000 m² production base with a workshop of more than 6,000 m², our process covers raw materials, machining, welding assembly, anti-corrosion coating, inspection and outgoing shipment.




How Will The Project Move?
Engineering Workflow
A conditional, staged path from requirements to shipment. Timeframes are indicative ranges confirmed against each order.
Requirements & Configuration
Share your application, flow parameters and site conditions so equipment can be configured to fit.
Production
Standard machines are typically produced in 15–25 working days; customized equipment in 30–45 working days; large complete sets in 45–60 working days.
Progress Feedback & Inspection
Production progress feedback is available during manufacturing, with third-party or outgoing inspection available on request.
Shipment
Equipment is prepared and shipped following outgoing inspection.
Common Questions
Frequently Asked Questions
Updates









